Hydrocracker.aiRefinery A · Hydrocracker Unit 1
Metric cards row (month-scoped) · MonthBaseline

Current state

Does R1 follow the feed? Feed nitrogen, monthlyR1 WABTClick a month to select it

Workshop · Chart XY (line + area layers)

Middle distillate output, bbl/day 7-day average

Workshop · Chart XY (100% stacked bar, 3 rows) · MonthBaseline

Where each barrel of fresh feed went, month by month

Diesel Kerosene Naphtha LPG Unconverted oil to FCC

Engineering detail and assumptions

Bands: end of run calibrated so R2 reaches it in Sep 2025, the licensor’s projected end of catalyst life. Start of run and advisory are assumed.

Workshop · Chart XY (line + projection layers) · CatalystRun, MonthBaseline

The cost of the habit: R2 doing R1's work

Illustrative economics
R2 actual R1 actual R2 projected, current practice R2 projected, if R1 carried its share
Object table · CatalystRun

Temperature rise per month, by reactor and run

RunR1 °C/moR2 °C/moWho did the work

The fitted rise across each run's operating days. A balanced run raises both reactors together. When R2 rises much faster than R1, R2 is doing work R1 could do at lower cost.

Workshop · Chart XY (grouped bar) · MonthBaseline bed columns

Bed temperature profile: where the heat is released

Start of run (first month)Selected month

Workshop · Chart XY (line) · PriceMonth (EIA)

Product cracks vs Brent over the run, $/bbl

EIA · US Gulf Coast proxy
Workshop · Chart XY (stacked area) · MonthBaseline

Where each barrel of fresh feed went, every month of the run

DieselKerosene NaphthaLPG Unconverted oil to FCC